Highway 25 closed for at least 3 months, says Quebec transport minister - Action News
Home WebMail Saturday, November 23, 2024, 06:55 PM | Calgary | -11.4°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Montreal

Highway 25 closed for at least 3 months, says Quebec transport minister

Quebec's Transport Ministry will replace the culverts under the stretch of highway that collapsed near Saint-Roch-de-l'Achigan earlier this month. Police will also step up their presence, to prevent impatient motorists from using the blocked road.

Police presence being stepped up to prevent impatient drivers from trespassing on blocked road

Quebec Transport Minister Laurent Lessard said the closure of the highway in both directions is inconvenient for motorists, but safety is more important. (CBC)

QuebecTransport Minister LaurentLessardsaid the craterthat swallowed a chunk of Highway 25 last week is likely to keep that stretch of road in the Lanaudire region closed for as long as threemonths.

On April 13, a sinkholeseven metres deep and nine metres wide opened up, causing the highway's partial collapse and forcingmotorists to takea 5.5-kilometre detour nearSaint-Roch-de-L'Achigan, about 50 kilometres north of Montreal.

Lessardblamed heavy rains for washing out two culverts which were in a worse state of degradation than his ministry had realized.

He said it will take about a month to complete the geotechnical and hydraulic studies now underwayand another six to eight weeks to repair and widen those culverts. Under that schedule, it will be mid-summer before the highway will be openin both directions once again.

A second phase of repairs, involving the addition of three more culverts, will be completed in the fall.

"We're going to make sure that everything is done diligently. I am very conscious of the constraints that this will cause to citizens, but we have no choice," Lessard said.

Obey detours, transport officials urge

Transports Qubecofficials said commuters have been ignoring the detour signs and going on the blocked road despite the dangers, out of impatience.

The ministry plans to erect more warning signs and have asked police to increase their presence to prevent that from happening.

It also plans to shorten the northbound detour, by linking the exit to the nearest ramp onto Highway 25 north. However, the 5.5-kilometre long southbound detour will remain in place until the first phase of repair work is completed.

With files from Antoni Nerestant